Using Fusion 360 in EXTático watches

Using Fusion 360 in EXTático watches

                          Fusion 360 for extatico watches is a new tool of Autodesk that joins design, mechanical engineering and machining. This tool uses the cloud for collaboration between different people. The idea is that customers can use this tool without come out of Fusion. They even collaborate between them in the cloud. From first stroke until machining simulation customer can work with Fusion. This is very interesting because designers don’t need to buy expensive programs for doing a new design and show it by emails. Work in cloud permits to do it easily as well. Moreover, this tool is uptodate constantly. So, improving are provided each 2 or 3 months. Autodesk idea is to offers a product that simple customer or professional engineer can do his own design, beginning from a sketch and ending with code for machining. So, we haven’t necessity to invest in expensive software. Fusion 360 has a good price with a lot of design tools. Thus, we can invest in machinery for making our watches in own workshop like CNC, pad printer, sandblaster, etc. So far, fusion 360 gallery has admitted one of extatico watches like bronze diver. It was a good news for us, because  it is a reward for our effort. We are currently doing a 3D simulation of the movement. Let’s introduce and display it in our laboratory of extatico watches. Fusion 360 allows to design with polygons, surfaces and solids too. As well CAM software in fusion is of 3-5 axes, very similar to Autodesk HSM software. We can do drawing in autocad,...
A Juntor machining study

A Juntor machining study

We have made a Juntor machining study, because we are going to manufacture a watch case in house. So far, we sent our watch files to Córdoba in Spain. Now, we will make our watches here in Alcoy, almost all parts. Therefore, we have made this simulation with 360 Fusion software of autodesk. The software allows to know which tools we need to mechanize, feeds, step over, time etc. In this case we have checked a simulation with titanium material. We have needed 16 minutes for do it with low speed and flood. The finishing has been made until 0,1mm but we can reach 0,05 of precision. We can mechanize watches in few time. So, we have needed 3 tools and 4 different...